Nylon Training Dog Leash Webbing Recall Long Lead Line Pet Traction Rope Great for Teaching Camping Backyard

£9.99

  • Type: Leashes
  • Dog Leash Type: Double Leashes
  • Material: Nylon
  • Type: Dogs
  • Season: All seasons
  • Pattern: Solid
  • Feature: Breakaway
SKU: DGLE313549879 Category:

Product name: luminous index cord

Product size: 1.5 meters in length, diameter: 1.0 cm

Color: multi-color optional

Reviews

There are no reviews yet.

Be the first to review “Nylon Training Dog Leash Webbing Recall Long Lead Line Pet Traction Rope Great for Teaching Camping Backyard”

Your email address will not be published. Required fields are marked *